| High | I-15 EXPRESSLink
Construction
Roadway Reconstruction
I-15 reconstruction and widening. SB I-15 at 2300 N and 900 W entrance and exit ramps closed. Check CommuterLink Construction Alert for up to date happenings.
| Davis | 1/3/2009 12:00:00 AM | 12/30/2010 11:59:00 PM |
| High | Stripping Ramps I-215
Construction
Resurfacing
EB I-80 to NB and SB I-215 Ramps closed for stripping.
| Salt Lake | 3/11/2010 11:00:00 PM | 3/12/2010 4:00:00 AM |
| Medium | US 6 Tucker
Construction
New Construction
Beginning of Skyline Dr. and Starvation Road. Installing box culvert and retaining wall. Preparation for abutment construction.
| Utah | 9/30/2008 12:00:00 AM | 5/30/2010 11:59:00 PM |
| Medium | Syracuse Road Antelope Drive
Construction
New Construction
Allison Way utility work install sewer laterals. Watch lane shifts and construction vehicles.
| Davis | 6/3/2009 7:30:00 PM | 7/30/2010 7:30:00 PM |
| Medium | 11400 South Interchange
Construction
Roadway Reconstruction
New interchange and road construction and road widening at 11400 South connecting to I-15 and wideniing from State Street to Bangerter Highway.
| Salt Lake | 3/3/2009 12:00:00 AM | 11/3/2010 11:59:00 PM |
| Medium | 11400 South widening and
Construction
New Construction
between State Street and Bangerter Hwy. Watch for flagging and intermittent closures along the project route
| Salt Lake | 1/1/2009 12:00:00 AM | 9/30/2010 11:59:00 PM |
| Low | Grand County US-191
Construction
Bridge Work
SB turning lane to SR 128 closed during the day for construction. Pouring Bridge segments and slope barrier walls construction continues.
| Grand | 3/10/2009 12:00:00 AM | 11/30/2010 11:59:00 PM |
| Low | 500 S 500 S Road Widening W Bountiful and Woods Cross
Construction
Roadway Reconstruction
Expect intermittent flagging as equipment enters & exits construction areas
| Davis | 5/27/2009 12:00:00 AM | 7/30/2010 11:59:00 PM |
| Low | SR 198 Spanish Fork Bridge Replacement
Construction
Bridge Work
Main Street from Fairgrounds to Arrowhead Trail Bridge demolition. Traffic will shift to west. During demolition no left turns to NB traffic at intersection onto Main Street. Use Woodland Hills Drive as alternate route
| Utah | 11/23/2009 12:00:00 AM | 7/30/2010 11:59:00 PM |
| Low | I-15 Exit 4 Bloomington Interchange Modifications
Construction
New Construction
Exit 4 interchange modifications. Ramp work continues on east side of interchange. Excavation and concrete work on east roundabout.
| Washington | 8/1/2009 12:00:00 AM | 4/2/2010 11:59:00 PM |
| Low | SR 92 Lehi to Highland
Construction
New Construction
Storm drain installation under I-15 causing some traffic restrictions on SR 92. Flaggers will direct traffic when needed
| Utah | 11/7/2009 7:00:00 AM | 7/30/2010 5:00:00 PM |
| Low | 700 East Widening
Construction
Roadway Reconstruction
between10500 South to 12300 South widening and storm drain project. 700 East reduced to 1 lane each direction.
| Salt Lake | 1/3/2010 12:00:00 AM | 11/3/2010 11:59:00 PM |
|