ImpactDetailsCountyStart DateEnd Date
HighI-15 EXPRESSLink Construction Roadway Reconstruction I-15 reconstruction and widening. SB I-15 at 2300 N and 900 W entrance and exit ramps closed. Check CommuterLink Construction Alert for up to date happenings. Davis1/3/2009 12:00:00 AM12/30/2010 11:59:00 PM
HighStripping Ramps I-215 Construction Resurfacing EB I-80 to NB and SB I-215 Ramps closed for stripping. Salt Lake3/11/2010 11:00:00 PM3/12/2010 4:00:00 AM
MediumUS 6 Tucker Construction New Construction Beginning of Skyline Dr. and Starvation Road. Installing box culvert and retaining wall. Preparation for abutment construction. Utah9/30/2008 12:00:00 AM5/30/2010 11:59:00 PM
MediumSyracuse Road Antelope Drive Construction New Construction Allison Way utility work install sewer laterals. Watch lane shifts and construction vehicles. Davis6/3/2009 7:30:00 PM7/30/2010 7:30:00 PM
Medium11400 South Interchange Construction Roadway Reconstruction New interchange and road construction and road widening at 11400 South connecting to I-15 and wideniing from State Street to Bangerter Highway. Salt Lake3/3/2009 12:00:00 AM11/3/2010 11:59:00 PM
Medium11400 South widening and Construction New Construction between State Street and Bangerter Hwy. Watch for flagging and intermittent closures along the project route Salt Lake1/1/2009 12:00:00 AM9/30/2010 11:59:00 PM
LowGrand County US-191 Construction Bridge Work SB turning lane to SR 128 closed during the day for construction. Pouring Bridge segments and slope barrier walls construction continues. Grand3/10/2009 12:00:00 AM11/30/2010 11:59:00 PM
Low500 S 500 S Road Widening W Bountiful and Woods Cross Construction Roadway Reconstruction Expect intermittent flagging as equipment enters & exits construction areas Davis5/27/2009 12:00:00 AM7/30/2010 11:59:00 PM
LowSR 198 Spanish Fork Bridge Replacement Construction Bridge Work Main Street from Fairgrounds to Arrowhead Trail Bridge demolition. Traffic will shift to west. During demolition no left turns to NB traffic at intersection onto Main Street. Use Woodland Hills Drive as alternate route Utah11/23/2009 12:00:00 AM7/30/2010 11:59:00 PM
LowI-15 Exit 4 Bloomington Interchange Modifications Construction New Construction Exit 4 interchange modifications. Ramp work continues on east side of interchange. Excavation and concrete work on east roundabout. Washington8/1/2009 12:00:00 AM4/2/2010 11:59:00 PM
LowSR 92 Lehi to Highland Construction New Construction Storm drain installation under I-15 causing some traffic restrictions on SR 92. Flaggers will direct traffic when needed Utah11/7/2009 7:00:00 AM7/30/2010 5:00:00 PM
Low700 East Widening Construction Roadway Reconstruction between10500 South to 12300 South widening and storm drain project. 700 East reduced to 1 lane each direction. Salt Lake1/3/2010 12:00:00 AM11/3/2010 11:59:00 PM
  Page of 2   Next   Last
* Click on a column name to sort the data by that column. Click on the same column a second time to reverse the order.
The "Impact" column grades the traffic flow disruption due to construction, based on UDOT's criteria, as follows:
High = over 15 min delay Medium = 5-15 min delay
Low = 0 - 5 min delay Unknown = unknown delay